Introduction
In the northeast corner of North America, a major city with a busy airport sits on an island so tightly wedged between the mainland that it can be easy to forget it is an island at all. The Island of Montréal, located in the Canadian province of Québec, is home to both the City of Montréal and Montréal–Pierre Elliott Trudeau International Airport.
Most of the airport lies within the City of Dorval and the borough of Saint‑Laurent, but portions of the site extend into Pointe‑Claire. The airport was there long before the surrounding urban development fully took shape, and over the decades the city has effectively grown up around it, a process that has continued from the 1940s through today.
On September 1, 1941, Dorval Airport officially opened on land that had once been a racetrack acquired by the federal Department of Transport. Its initial purpose was almost entirely military. Pilots from across the Commonwealth trained there, and the airport played a key role in the Allied war effort, with nearly 10,000 aircraft passing through Dorval on their way to Great Britain between 1941 and 1945.
With the end of the war, Dorval transitioned quickly into a major civilian airport. By 1955 it had become the busiest and largest airport in Canada, handling more than a million passengers annually and serving as the country’s primary gateway to Europe. Trans‑Canada Air Lines—later Air Canada—established a strong presence early on, launching transatlantic service from Montréal and cementing the airport’s role as a key North American hub during the early jet age.
That rapid growth drove a major expansion. In 1958, a new 9,600‑foot runway, 06R/24L, was added, and in 1960 the airport opened what was then the largest single‑building passenger terminal in the world. At that point, the airport was renamed Montréal‑Dorval International Airport. In the years that followed, the original 06L/24R was extended in stages, eventually reaching its current 11,000‑foot length.
Even so, expectations at the time pointed toward continued explosive growth. In the 1970s, the Canadian government attempted to address this by opening Montréal–Mirabel Airport north of the city, shifting international traffic there while Dorval handled domestic and transborder operations. The arrangement never worked particularly well, leaving Montréal with two major airports sharing the load in a way that proved inconvenient for both airlines and passengers.
By the late 1990s, that approach began to unwind. Traffic and investment returned to Dorval, which once again became Montréal’s primary airport. Renamed in 2003 in honor of former Canadian Prime Minister Pierre Elliott Trudeau, the airport has since evolved into a major international hub and a key base for Air Canada, connecting eastern Canada with Europe, the United States, and beyond. (Sources include AirportHistory.org and histoire-du-quebec.ca.)
More than an Expansion
Globall Art has chosen an interesting time to release a new version of the airport for X-Plane as it is in the midst of some major changes that have already begun to eclipse the details of the scenery package we are looking at. The airport is undertaking what is often referred to as a roughly $4 billion expansion. This is actually the front end of a much larger transformation program that will reshape nearly every aspect of Montréal–Trudeau over the next decade, with a final price tag of closer to $10 billion.
The immediate focus is on solving very real capacity and congestion issues, particularly on the landside where road access has become a bottleneck. Plans include a complete reconfiguration of the approach roads, expanded pickup and drop-off areas, and the replacement of the existing parking garage with larger, higher-capacity facilities, all aimed at dramatically increasing the airport’s throughput and easing access for passengers.
At the same time, the airside and terminal environments are being reworked to match that growth. A new satellite jetty will add gates and reshape how aircraft are handled on the field, while additional taxiways, apron space, and upgraded baggage and passenger processing systems are intended to reduce bottlenecks and improve operational flow. Tying the whole project together is the planned REM light‑rail connection to downtown Montréal, expected to reach the airport later in the decade, fundamentally changing how travelers access the field.
As you can see, CYUL is very much an airport in flux. Runway 10/28 has been officially closed and is now painted and configured as a taxiway; a change completed in the current scenery. The two changes significant enough to merit an updated version in the near future are the increased holding area at the end of Runway 24L—already in an advanced stage of construction—and the addition of a temporary four gate satellite jetty. That jetty is expected to have operational benefits by the end of next year and will ultimately be a twelve gate structure when it is completed. The date for that final stage is unknown at this time.
Trivia
A little piece of trivia for anyone who likes this sort of thing: YUL is the three‑letter designation for the airport, with the “Y” reserved for Canadian airfields. The “U” and the “L”? Well, they come from the Morse code identifier transmitted by the radio beacon at nearby Kirkland. Apparently, that beacon is still in use.
Installation and Documentation
Globall Art’s CYUL package is downloaded from Aerosoft and installed using the Aerosoft One application. The installation gives you the option to install the package directly into your Custom Scenery folder or into an external Aerosoft Library folder. When you choose the latter option, the installation will create the necessary links in your Custom Scenery folder so X-Plane will find and load the scenery.
The installed package resides in two folders: the airport folder and the mesh folder that, together, occupy 1.94 GB on disk. Once the installation is finished, the package will appear in your Aerosoft One library. The manuals button is active and does open the manual for the scenery package. Within the manual, you will find links to download .zip files that can be extracted and combined to create an orthophoto that covers the area in Montréal surrounding the airport.
Within the CA-A-CYUL Montréal Intern Airport folder is a plugins folder. This contains the GroundTraffic plugin that is loaded when you load the airport package. You can activate/deactivate the plugin from the plugin menu within X-Plane if you have a need to do so.
The Scenery
The backdrop for Globall Art’s CYUL is a medium resolution (approximately a ZL17 if you’re at all familiar with Ortho4XP nomenclature) orthophoto that likely predates 2024 when the construction of the 24L holding bay commenced. The orthophoto is kept within the airport boundaries and blends well with the surrounding default ground textures during the summer months which seems to be the time that the imagery was captured.
The blend is not as smooth when X-Plane alters the shading of textures for the other three seasons. The visual benefit of the imagery is degrades as altitude decreases and the sharpness of the photography is lost. This is not a developer issue, rather it is the nature of satellite imagery. A higher resolution image would degrade at a lower altitude than what is included in the scenery, but it would still degrade. The airport area is fairly devoid of vegetation and what little is present is three dimensional and responds to season changes.
The remainder of the scenery package is concerned with airport surfaces and structures along with surrounding roadways. At the end of Runway 24L, the major highway that transects the approach route to 24L travels underground. This is one example of the city developing around the airport as automobiles and airplanes needed to share space.
The use of ortho here does a nice job of depicting that underground structure but the animated vehicles moving over the baked in static vehicles on the highway can be visually challenging. There is an anomaly in the area where default roads are overwritten and plugin derived ground traffic drives across the grass. This is improved using the orthophoto mentioned above. The developer has indicated this will be corrected with an update at some point.
The Airport
The Tarmac – Runways
Montréal has two parallel runways—06R/24L at 9890 feet and 06L/24R at 11,000 feet. The former runway 10/28 has been decommissioned and is now a taxiway.
The runways are concrete and represented with custom concrete polygon textures layered with lines, grung, and and markings polygons. The detail of the texture is first rate and the specular properties appear to be appropriate for a concrete surface. A nice touch is the developer has used different textures to represent the runway rubber buildup and has not used it to excess.
Runway lighting appears to be in line with the current aerodrome chart. Runway 06L is equipped with a ALSF-2 Approach Lighting System while Runway 24R is equipped with a SSALR Approach Lighting System with Runway Alignment Indicator Lights. Runway 06R/24L has a displaced threshold with the SSALR approach lighting at each end. Each end of this runway is also equipped with PAPI lights.
The Tarmac – Taxiways
Taxiways around the airport are accurately routed and joined together without gaps. The texturing for the taxiways is fairly complex due to the myriad number of materials involved and the way they are intermixed throughout the airport. Regardless of whether it is an exact match to the actual airport, the mosaic of concrete panels, asphalt seams, faded older asphalt and darker newer repaired asphalt convey the feeling of an aircraft movement system that has seen a lot of tonnage in its day. Add to that the frost and ice cycles airports this far north experience and you can quickly understand that the developers had a handle on this when they lay down the texture.
The signage, lines, and lights serving as guidance are all as they should be and allow the pilot to navigate the ground routes in all kinds of weather conditions at any time of day. Assuming, that is, that a wild snowstorm hasn’t closed down the airport altogether.
Apron
Pierre Trudeau has three designated apron areas amongst the many paved areas within the airport boundary. These are the east apron and west apron in the terminal vicinity and the GA apron adjacent to Runway 24L where multiple FBO installations are lined up. The East and West aprons are under the control of the Apron Control Tower. The GA apron is uncontrolled.
The East and West aprons are styled accurately for surface material, lines, stall and gate markings, and lights. The same material properties are used for the aprons as are used on the runways and taxiways so the surface interaction with the X-Plane lighting engine is appropriate. The GA apron is very well represented with the different surfaces and surface conditions of the real world apron being taken into account.
No matter how well marked the aprons are, the reality of Montréal Pierre Trudeau’s aprons speak loudly to the airport’s motivation for wanting to update the entire thing. They are, in a word, a confusing mess to navigate. The aprons, ultimately, are a product of time; built with layered geometry, multiple activity zones blending together, routes that aren’t always visually obvious, and fraught with traffic density. And that’s the real world. And that sense of confusion is captured here. Surprisingly, even though the GA apron is an uncontrolled “close your eyes and taxi” apron, it may be more organized than the aprons around the terminal. Just for good measure, the GA apron does have three helicopter landing circles.
The Terminal
If you hear a pilot complaining about the confusing aprons, ask a passenger what their impression of the terminal is—you won’t like the answer any better. A review of passenger comments consistently shows impressions of a confusing and inefficient layout marked with poor wayfinding signage, overcrowding, and congestion. Interestingly enough, the passenger experience of the terminal is of a place that hasn’t evolved cleanly. Sounds like the tarmac. Apparently, Montréal Pierre Trudeau airport is at least good at being consistently inconsistent.
It also seems that the airport officials would agree with this since they are in the midst of what is estimated to be a $10 billion dollar “Flight Plan 2023-2043”. The architect’s model shows a landside that looks entirely different than the current one. Airside, the terminal will be subject to some expansion, some reconfiguration, and the addition of a new 12 gate jetty that will be reachable via tunnel or surface connection. The current aeroquai is going to be dismantled which will help clean up some of the apron confusion although the effect of replacing it with the new jetty, in a different location, will remain to be seen.
The terminal at Montréal–Trudeau is, at its core, still the 1960 jet-age facility that was once among the largest in the world, but it hasn’t really evolved so much as accumulated. After early expansions in the 1960s, its development was effectively interrupted by the Mirabel experiment in the 1970s, leaving Dorval to limp along as a partial facility for decades before being thrust back into primary service.
Rather than being rebuilt, it was subjected to a major modernization program from the late 1990s through 2009 that added new international and transborder jetties onto the existing structure, followed by further expansions through the 2010s to handle growing widebody and international traffic. What exists today is therefore not a clean, cohesive design, but a continuous layering of upgrades, extensions, and retrofits applied to a 1960 framework—each logical in isolation, but collectively resulting in a terminal that reflects its history more than any single unified vision.
The model that Globall Art has provided in their package is an excellent representation of the real building that has been expanded and modified, but never replaced. The building can be broken into the core structure, the Transborder (U.S.) jetty, the International jetty, and the Domestic area.
The core of the terminal dates from the 1960s and this is easily identifiable by its position within what is now the entire terminal complex and its recognizable pattern of turquoise, white, and blue surrounded by large tan-colored, almost marble in appearance, blocks. The developers have opted to render the building with a photo texture to capture the nuances of the actual central terminal which looks to be near impossible to capture with modelling textures.
This creates a fantastic experience of the building from a distance but flattens dramatically when in close; lacking the depth of shadow detail and reflective response that would allow different materials to react more dynamically to changing light.
Additional features of the original building include a nice rendering of what now serves as the Apron Control Tower. Here, the whitish blocks of the lower portion of the tower feature some textural depth that contrasts with the flatter photo-applied treatment of the top section. The developers did a nice job capturing the sense that this original section of the terminal has been gradually consumed by later additions.
The International jetty was added in the early 2000s and expanded again in the 2011-2016 expansion. The expansion added the widebody gates, more floor space, and more retail areas. It is a jetty that has been extended in place. It seems likely that the original expansion of the jetty culminated at gate 53 with gates 55-68 added in the later build-out. The area from gate 55 on has a different architectural appearance which would indicate this entire section was the 2011 expansion that included accommodation for the widebody aircraft
Gate 53 is rather interesting in and of itself. The developer includes a rarely used system for passenger boarding and deplaning that sent your reviewer down the proverbial rabbit-hole to figure out what it was. What you will see travelling the taxi lines between Gate 53 and hard stand W5 is what is called a Passenger Transport Vehicle or PTV. They are occasionally used at CYUL to process international travelers from aircraft needing to park at hard stands due to terminal gate limitations.
Likely originating from the failed Mirabel airport whose design was focused on minimizing passenger walking distances, the PTV moves the “gate” to the aircraft via large, enclosed mobile lounges capable of lifting to door height. It was an ambitious idea, but one that ultimately became emblematic of the kind of over‑engineered, highly specialized solutions that proved difficult to sustain in real-world operations.
The PTV was never intended to function as general-purpose apron traffic and its use was typically tightly controlled and tied to specific aircraft stands and procedures. The fact that the one animated PTV in the scenery package continuously traverses the above described path while violating apron ground traffic rules unintentionally mirrors the nature of the airport that we have already seen—a continuous time-lapsed layering of efforts to improve flow and convenience that are no longer working as a coherent system. By the way, AI traffic will collide with this.
The remainder of the International jetty has the patched together look that a multiphase build out would create. This is most noticeable with a close look at the roof where the photo texture in use shows the differing ages as well as materials. The remainder of the jetty is well made with the subtle changes in architectural style nicely captured. Texture and surface work have more depth than the core and the glazing is very reflective. The gates are detailed and operational via the X-Plane ground handling menu. Gates have plenty of ground traffic and ground clutter to provide an immersive experience.
The Transborder jetty opposes the International jetty to complete the “C” structure built off the end of the terminal. Interestingly, the apron control tower, judging by the scale of the model, has a very poor and obstructed view of the congested area inside the “C” that is surrounded by peripheral hard stand parking slots.
The Transborder jetty, initially opened in 2003, was modernized and standardized with the U.S. pre-Customs clearance area between 2006 and 2009. One internet source suggest the update opened on June 15,2006. The jetty is dedicated to the flights that originate in Canada and are destined for locations in the United States.
Passengers flying from gates 72-89 go through immigration, customs, and security for preclearance before boarding a plane. Depending on flow, International jetty gates 56, 58, and 60 can be configured for Transborder flights using moving glass walls known as swing gates. For all intents and purposes the passenger is already in the U.S. when they board the plane and their arrival is treated as a domestic flight.
From a modeling perspective, the jetty is constructed to look like one continuous jetty extending from the end of the terminal. Given that this jetty appears to have been constructed all at once without additional expansion, this is how one would expect it to look. As with the International jetty, the details abound from active gates to a spill kit bucket at one of the gates. Material and textures are accurately placed and aligned with a responsive specular quality and some depth in appearance.
Finally, we come to one of the most confusing areas of the airport from the passenger’s perspective. Located at the opposite end of the terminal is the Domestic service area. Domestic service was integrated into the original 1960 terminal and extended to a satellite terminal called the “Aeroquay”. This was connected to the main terminal via two tunnels. Passengers complained about the length of the walk so much that moving walkways were added in 1966. Incremental changes occurred between then and around the year 2000 but was mostly stagnant due to the Mirabel fiasco.
Then, during the 2000s modernization, the area was expanded and reworked. The main jetty has attached gates 1-12, 15, and 47-49. The satellite consists of gates numbered between 17 and 34. Of the three gate jetties, the Domestic is the one that is saddled with the greatest amount of a legacy system that never got replaced, only patched. It will be interesting to see how passengers respond to the new satellite being placed on the old runway 10/28 which is further away from the main terminal.
Moving to our model, we see the 1960s era turquoise/white/blue scheme with the tan panels on the domestic jetty that is a remainder of the original terminal as built and the repetition of the same scheme on the Aeroquay tells the story of where this layered monstrosity began and how the additions were put wherever they fit in a not so cohesive manner. In an interesting aside, a copyright photograph—dated 1999—that cannot be reproduced here, shows a control tower atop the Aeroquay.
In yet another layered evolution of the airport, this function was transferred to the original control tower atop the original core terminal building when the air traffic control functions were moved to the new control tower that stands closer to the International and Transborder jetties.
The developers model is a pretty precise rendition of the architecture of the jetty and the Aeroquay, capturing the segmented appearance of both. The shading and depth of the surfaces are very convincing from a distance but, as with the core building, seem to flatten some as the point of view gets closer. The albedo texture is providing excellent color that is intermingled with some baked in shading. The ambient lighting is adding shadows that interact quite well with the segmented construction. It seems like the use of the phototexture has made it difficult to really define the different materials as they lack distinct surface definition and meaningful variation in their reflective properties.
The busy apron look that is so well conveyed elsewhere continues around the domestic gates with cargo pods, ground traffic, cones, and static ground equipment. Gate numbering is clear on the ground and on the building in the case of the satellite terminal. Around the satellite terminal, marshallers are positioned at each gate and stand in that area. Unfortunately, they are a relic from the old Autogate plugin that is no longer supported or recommended for X-Plane 12. Perhaps these could be removed or changed to work with the OpenSam plugin in a future update.
That pretty much covers the terminal. There are many airports with multiple terminals that do not have the layered history that Montréal has and are, therefore, in many ways easier to traverse and easier to model, and easier to review.
The Tower
As it became clear that the Mirabel experiment was wobbling and the domestic and transborder operations at Dorval were on the rise, the decision was made to build a new 170 foot independent control tower that had a visual range covering the entire airport. The original tower still existed and the ancillary tower atop the satellite remained until at least 2000. Air traffic had increased, however, which means ground traffic and operations did as well.
So, in what turned out to be an almost fortuitous decision, the tower was built. When the Mirabel experiment finally crashed and burned, the new tower was capable of handling the retuning international flights and the terminal expansions. The new tower now handled taxiing to and from the runways, sequencing departures, spacing arrivals, and making sure nobody ends up where they shouldn’t be at speed.
Eventually, apron control becomes consolidated in the old tower and the one atop the satellite is decommissioned and removed. Now the pushbacks, stand assignments, aircraft movements around ground equipment, and catching any vehicles doing things they shouldn’t be doing (like driving across the apron following taxi lanes).
We’ve already seen the modeling that was done to convincingly render the old tower atop the core building. The modeling on the new tower is along the same lines of the older tower. What appears to be photo textures are used to surface all parts of the tower with highlight and shadow baked in. The ambient light interacts well enough to provide some sense of depth from a distance, but up close the lack of material definition and variation causes the different surfaces to lose distinction, flattening out as the texture begins to blur. The glass does have a suitable reflective property to generate a fair amount of reflection.
The sculpting and geometry of the tower is flawless with all the disparate parts fitting together nicely. The placement of the tower is accurate and reveals another example of the airport layering on one modification on top of another. How else would a tower find itself rising from the ground like it was the only building there only to look like it is springing from a hole in the terminal roof? This looks like it was conceived, designed, and built in a relative hurry. The developers have that nuance nailed.
Airport Support
In their Horizon 2023-2043 report, ADM delineates six airport support service areas. This section is a quick scan of those areas to check on their inclusion in the model, as they represent the essential infrastructure that, once you move beyond passenger movement, reveals itself as what makes that movement possible and safe.
These areas are the fuel supply hub, the fuel distribution hub, the de-icing area, the fire services area, the falconer’s area and the warehouse and maintenance hub for ground service vehicles. So, without further ado, we’ll head for the two fuel related areas.
The fuel supply hub is outside of airport boundaries and is not included in the scenery pack. The fuel distribution hub is included and most of the existing infrastructure is modeled. Given its location, it is easy to miss as it is sequestered behind a large cargo warehouse. The deicing area is located across the apron from the terminal and has been treated with the same texture and material properties as the other aprons around the airport. The lines are clear and markings are accurate. If you read the manual, you will find instructions outlining how to set up an interactive experience and have your airliner de-iced.
Fire Services are located adjacent to the deicing apron. The building is clearly modeled and easily identified. It doesn’t hurt that there is an emergency vehicle parked in front. In the vicinity of the fire services building, a very unobtrusive group of containers is arranged under lights. This is the falconer’s area where an ancient art is practiced in the name of air safety. Trained handlers traverse the airport with the predatory raptors to convince any birds that could be the source of an aviation emergency that the airport is not a place they want to frequent.
Finally, tucked away in the southwest corner of the airport, behind the Transborder hard stands, the warehouse and maintenance hub has been rendered by the developers. The building presents as amazingly detailed and this perception holds up from a distance. The equipment around the building excels at defining its sense of purpose.
General Aviation
Adjacent to Runway 24L lies the General Aviation apron. The apron itself has already been considered so this brief survey will be of the buildings included around the apron. One interesting note is that the sounds of construction are in the air. The Horizon 2023-2043 report has as short term plans, these two items: first, to study the possibility of building a regional satellite terminal; second, to develop a new apron area for that terminal. The area on the map earmarked for this is the current General Aviation apron. The folks on the apron might want to consider packing up and moving—maybe even as far as over to the expanding Montréal City Airport. In the meantime, the buildings are still here so let’s have a look at them.
There are five distinct buildings in the midst of the many that populate this area that are truly modeling standouts. The structure of the buildings is accurate enough to create the feeling of standing in front of the real thing. The interaction of light with the various parts that are integrated into complete buildings defines the modeled segments that had to be joined, one to another into cohesive, whole structures. These structures, geometrically, are faultless.
Once again, however, the resolution of the surface textures is too low to sustain that level of immersion when you move in close—particularly when pulling up to the adjacent parking stands Some of the signage on the buildings is part of the surface textures so they suffer the same fate whereas the ones that have been rendered have been done so with care and they keep their distinctive properties even when parking at the closest stand.
Other Buildings
If you decide to acquire this package for your X-Plane installation, take the time to roam around the area after your installation.
There are several other buildings that are finely modeled that add to the overall impact of Globall Arts’ presentation of Montréal Pierre Trudeau International Airport.
Summary
Exploring Montréal Pierre Trudeau International Airport is an exercise in traversing the historical layers that have accumulated over time, reflecting how successive efforts have been made to adapt the airport to changing needs. As a result, Montréal is now undertaking a significant 10 billion dollar redevelopment effort aimed at addressing long-standing challenges. Among the planned changes are the addition of a new remote terminal, an approach that has played a notable role in the passenger experience over the years, a regional terminal that may displace the General Aviation apron and buildings, and another extension to the Transborder jetty. On the tarmac, construction is well underway for a holding area at 24L. Landside, the plans call for an extensive rebuild of the parking structures and roadway system as well as the addition of a railway connection.
There is no question that Globall Arts’ presentation of CYLU creates a different world than the default scenery. Buildings are skillfully modeled to have the shapes and appearance that reflect their real-world counterparts, tarmac textures are improved by the developer’s attention to rubber buildup, other grunge, and attention to detail, and the use of photo textures insures that the visual details of complex building structures are preserved.
Airport lighting is excellent and appears to match what is indicated on published information. The tarmac does reflect weather conditions from light standing water to ice and snow. Included vegetation is 3D and reflects seasonal changes while the ortho ground, unfortunately, is unable to.
Runway rules, during the evaluation, appeared to be properly set up as demonstrated by the movements of AI aircraft which, for the most part, follow the rules set in the scenery add-on. AI aircraft movements on the taxiways matched the same routing instructions X-Plane’s ATC provided for me to follow from similar gate or stand locations to the runway. The only unusual moment occurred when an AI aircraft collided with the animated PTV crossing the apron on a taxi route.
Globall Art’s presentation reflects the airport in another way as well. Just as one cannot expect an airport like Montréal to tear everything down to reset and restart to remove the accumulation of years of development, so it would not be feasible in the world of flight simulator scenery development to tear down a previously successful effort and start over to provide the identical scenery for a new version of the simulator.
However, the updates from X-Plane 11 to X-Plane 12 introduced several features that have a direct impact on how objects look in the environment because the rules of interacting with ambient light have changed. The result is that in X-Plane 11, photographic textures could carry a lot of the load in presenting a realistic looking structure.
In X-Plane 12, the environment is not as forgiving and pretty much requires that objects have well defined, interactive, material properties that go well beyond what a flat photograph can provide. That world change, if you will, is what contributes to the only notable drawback in the scenery as we have seen with many of the buildings treated with photo textures.
Beyond the environment change, there remains a couple of other vestiges of days gone by. These would be the presence of static marshallers standing around at many gates and stands and an non-operational VDGS . Both of these relied on an antiquated Autogate plug-in that is not recommended for use in X-Plane 12.
Despite the airport not being built for X-Plane 12 from the ground up, it remains a very viable add-on that enhances the sim pilot’s experience at Montréal Pierre Trudeau International Airport. If you like stars, give this one a four. More information can be found at the dedicated Aerosoft store page or you can check out X-Plane.Org.
Until next time, cheers and blue skies.
Feel free to contact me if you’ve got additional questions related to this impression. You can reach me via email Angelique.van.Campen@gmail.com or to Angelique@X-Plained.com.
With Greetings,
Paul Beckwith
| Add-on: | Payware Globall Art Montréal International Airport for X-Plane 12 |
|---|---|
| Publisher | Developer: | Aerosoft / X-Plane.Org | Globall Art |
| Description: | Highly realistic representation of Montréal International Airport |
| Software Source / Size: | Download / Approximately 1.94GB (unzipped) |
| Reviewed by: | Paul Beckwith |
| Published: | May 21st 2026 |
| Hardware specifications: | - Ryzen 99000X3D - 32 GB DDR5 4800MHz RAM - Nvidia GeForce RTX 5080 16 GB GDDR6X - Turtle Beach Velocity One Flightdeck - Logitech G Rudder Pedals |
| Software specifications: | - Windows 11 Pro - X-Plane 12.x (64 Bit) |















0 Comments